Non-productive overtime
Non-productive overtime (NPO) is time that employees or workers spend in the workplace over and above their contracted hours but which is not being spent on productive activities. If this is not managed effectively and monitored carefully it can have negative and costly implications for a business or project.
An example could be using the internet or deliberately not working, or working at a slow pace, when doing overtime.
However, there can be circumstances when non-productive overtime cannot be avoided. For example, if construction works are being accelerated to try and meet a deadline, requiring overtime, but exceptionally adverse weather then means some workers have to curtail their activities, albeit, temporarily. In addition, if activities in certain conditions could put workers at risk, it can be considered reasonable to stop work or to work at a slower pace. Works can also stop due to a lack of equipment, materials or information, delays on related activities and so on.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Preserving, waterproofing and decorating buildings.
Many resources for visitors aswell as new features for members.
Using technology to empower communities
The Community data platform; capturing the DNA of a place and fostering participation, for better design.
Heat pump and wind turbine sound calculations for PDRs
MCS publish updated sound calculation standards for permitted development installations.
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.
Heritage staff wellbeing at work survey.
A five minute introduction.
50th Golden anniversary ECA Edmundson apprentice award
Showcasing the very best electrotechnical and engineering services for half a century.
Welsh government consults on HRBs and reg changes
Seeking feedback on a new regulatory regime and a broad range of issues.